Service 02 — Install
Structured cabling
Wi-Fi gets the glory, but cable does the work. We install certified Cat6A and fibre backbones with tidy racks, labelled runs and test results for every drop — the invisible layer everything else depends on.
- Typical timeline
- 1–3 weeks
- Best for
- Fit-outs, refits, new floors
- Standard
- Cat6A · OM4 fibre · certified
Overview
Cable is forever — do it once
Cabling lives inside walls and ceilings for a decade or more, so it pays to over-specify. We run Cat6A to every desk and access point for 10-gigabit headroom, with OM4 fibre backbones between floors and cabinets.
Every run is labelled at both ends, dressed into the rack with proper management, and tested with a certifier — you receive the full test report, so warranty claims and fault-finding are trivial years later.
What’s included
From containment to certificate
01
Cat6A copper runs
10-gigabit capable drops to desks, APs, cameras and door controllers.
02
Fibre backbones
OM4 links between cabinets and floors with proper bend-radius care.
03
Racks & power
Rack build-outs, patch management and UPS-backed power for the core.
04
Labelling & records
Every port labelled both ends and logged on as-built floor plans.
05
Certification testing
Full certifier test on every link with a pass/fail report you keep.
06
Out-of-hours working
Nights and weekends available so occupied offices never stop working.
Process
How we deliver it
01
Count the drops
Survey every desk, AP, camera and printer — plus spares.
02
Pull & dress
Runs pulled, terminated and dressed into labelled patch panels.
03
Test & certify
Every link certified; failures re-terminated and re-tested.
04
Document
Test reports and as-builts handed over in one tidy pack.